Some
Westside Vancouver residents were recently shocked to see large red and black
signs posted around their neighbourhoods announcing the recommencing of CPR railway
operations. They were
warned not to stop on tracks, obey flag persons and call 3-1-1 for information.
The signs
were installed by the City of Vancouver at the request of Transport Canada.
For those
not quite sure why active railway traffic will soon be running along the
Arbutus Corridor, allow me to offer some background, and a potential solution
to end the longstanding impasse between CP and the city.
The 11 km
long Arbutus Corridor was given to CP Rail in 1886 and the first rail line was
built in 1902 to move cargo and passenger trains. By 1999,
train operations were limited to serving the Molson brewery and the company
began plans to redevelop the land into a mix of residential and commercial
uses.
To prevent this from happening, in
July 2000 the city enacted the Arbutus Corridor Official Development Plan that
designated the land for transportation, parks, and greenways only.
CP
subsequently took the city to court arguing that the city had effectively taken
its property without compensation. However, the city won since it generally has
the right to zone land in the public interest.
Five years
later, CP initiated a planning exercise that included participation from four
neighbourhoods- Kitsilano, Arbutus Ridge/Shaughnessy, Kerrisdale and
Marpole-through which the rail line runs. Stanley
King, a local planner who has a magical ability to illustrate what people are
saying was brought in, along with an advisory panel that included Nola-Kate
Seymoar, president of the International Centre for Sustainable Cities. Mark
Holland, a respected sustainability planner, UBC’s Patrick Condon, and former
NDP premier Mike Harcourt I attended some
of the deliberations as a past director of the International Centre for
Sustainable Cities.
Eventually a
report was prepared that argued against using the lands solely for a greenway
with bike paths and walkways because, despite meeting certain sustainability
principles, this was not financially sustainable. Moreover, it did not include green
buildings and infrastructure, or diverse housing choices, all of which are key
tenets of sustainable planning.
The
preferred plan envisioned maintaining a continuous transit corridor, with mixed-use
development at key nodes including Kerrisdale Village, where the corridor is
flanked by city streets on two sides, and around 33rd, 16th and other
major arterials.
In response
to those who question whether it is possible to retain a transit corridor
through development, you might be interested to know there are two transit
corridors reserved through Coal Harbour’s Bayshore development; one above
ground and one below ground.
By combining CP’s land with the city’s land, the planners concluded it was possible to create significant value for CP, which in turn would allow the city to acquire the balance of the corridor for next to nothing.
However, shortly thereafter, the city successfully fought against any development along the corridor after the Supreme Court of Canada upheld the previous municipal bylaw that restricted the right-of-way’s use to a greenway and car-free transportation corridor.
Fast forward
to summer 2014.
After the
city and CP failed to agree on a fair market price for the property, CP
threatened to start running trains along the line and insisted that community
gardens and other public use cease immediately. This time
the city took the railway to court, but lost.
In a subsequent
letter to neighbourhood residents, the president of CP wrote:
“For many
years now, CP has been involved in conversations to convert the Arbutus
Corridor for a number of combined public uses, such as a greenway, public
transportation, community gardens and Eco Density development. Despite our
efforts, the company and other parties have been unable to achieve a plan for
the disposition of this valuable asset.”
If you would
like to speak to those “other parties” just dial 3-1-1.
Tell the
city it’s time to agree on a plan preserving a transit corridor, along with a
mix of public amenities and sustainable development. This will make much more
sense than watching trains going forward and backward while lawyers argue in
court.